Specification
| Strut diameter | 600 / 800 / 900 mm |
|---|---|
| Section | ISMB 400–600 walers |
| Stock | 1,200 T available |
| Preload | Hydraulic, to 150 T |
| Levels | up to 3 typical |
| Connections | Bolted, reusable |
| Coating | Primed, site-repaired |
| Recovery | 100% recovered and reused |
What it is used for
Internal strutting of deep excavations
Waler systems behind diaphragm and secant walls
King post and needle beam propping
Temporary support to adjacent structures
Included in the rate
Erection and dismantling crew
Temporary works drawings and load checks
Hydraulic preloading and records
Settlement and convergence monitoring
Transport both ways
Recovery, cleaning and re-stocking
“Steel is hired, not sold. You pay for the time it stands in your excavation — we take it back, clean it and put it out again.”
Availability
Mobilised from the Ahmedabad yard to any site in Gujarat or Uttar Pradesh. Transport, assembly and the operator are inside the quoted rate.
1,200 T
Steel in stock
24 h
Breakdown response
1 month
Minimum hire period
4 cities
Mobilisation base
Also in the yard
Need a machine and a crew?