Ground Support Systems

Struts, walers, shoring

What this service covers

A retaining wall is only as good as what is holding it. We design, supply, erect and later recover the steel that props an excavation — sized to each stage of the dig, not to a single worst case.

Where buildings stand close, the scheme starts before the excavation: pre-condition surveys, settlement markers and a monitoring regime that turns movement into a number instead of a dispute.

Stage-wise propping and de-propping plans

Settlement markers and movement monitoring

Pre-condition surveys before work starts

Steel supplied, erected and recovered by us

3 levels

Typical strut levels

600–900 mm

Pipe strut diameter

Weekly

Monitoring reports

100%

Steel recovered & reused

How we do it

The sequence on site

Written down before mobilisation, so nobody discovers the plan halfway through the dig.

01

Pre-condition survey

Photographic and dimensional record of everything standing within the zone of influence.

02

Scheme design

Strut, waler and king post layout with a stage-by-stage load check for each dig level.

03

Erect & preload

Steel erected level by level as the excavation drops, preloaded where design requires it.

04

Monitor & de-prop

Settlement and convergence read weekly; steel released in reverse sequence as slabs cast.

Where it is used

Typical applications

Some of the situations clients bring this service to us for.

Tight urban plots

Excavations with zero setback from a boundary wall or an occupied building.

Metro & utility trenches

Long cut-and-cover runs propped in bays to keep traffic diversions short.

Existing structures

Underpinning and temporary support alongside live buildings and factories.

Deep pits

Lift pits, tank pits and pump chambers inside a completed basement.

Ground Support Systems on site

180+

Projects delivered

On record

Every claim backed by a document

Verticality logs, cube results, test certificates and daily safety sheets are collected as the work happens and issued weekly — not assembled the week before handover.

Frequently asked

Ground Support Systems — common questions

Something else on your mind? Call the office — an engineer answers, not a call centre.

Yes. Layouts, load checks and a written method statement come from our engineering team and are issued for your consultant to review.

It is ours. We recover, clean and reuse it — you pay for use, not for buying a yard full of sections.

Markers on adjacent structures are read weekly against a pre-agreed trigger value. Cross a trigger and work stops until the cause is understood.

Yes. King posts and needle beams are routinely used to prop through and around existing slabs and foundations.